Government SI Register · DOE · High impact

Advanced Long Term Environmental Monitoring Systems (ALTEMIS)

The Department of Energy lists "Advanced Long Term Environmental Monitoring Systems (ALTEMIS)" in the 2025 federal inventory as a high impact SI use case at the pilot stage, in SRS - SRNL - Savannah River Site - Savannah River National Laboratory (EM). In the agency's words, the problem it is meant to solve: "Reduce the cost of long-term monitoring using integrated sensing technologies and AI/ML to forecast groundwater plume migration and anomalies." Every field below is quoted as filed.

ID DOE-714Stage PilotSource row 795

The record, as filed

Every field the agency reported

Bureau or component
SRS - SRNL - Savannah River Site - Savannah River National Laboratory (EM)
Stage
Pilot
High impact status
High-impact
Topic area
Energy and Environment
Technology type
Classical ML
Problem it is meant to solve
Reduce the cost of long-term monitoring using integrated sensing technologies and AI/ML to forecast groundwater plume migration and anomalies.
Expected benefits
Proactive, rather than reactive, monitoring of complex geochemical systems.
What the system outputs
Spatiotemporal optimization of sensor locations, correlate proxy variables (e.g., pH, specific conductance, water table elevation, etc.) with contaminants, measure proxy variables with various sensing modalities, predict concentrations across space and time given proxy variables.
Operational or pilot start
2022-09-01 00:00:00
How it was built or bought
In-house Development
Vendors
Python
Authorization to Operate
Yes
System name
SRNL-SRS ATO
Data used to train, tune or evaluate
Sensor systems: In Situ (vendor name) well sensors, electrical resistivity tomography system, custom vertically resolved temperature sensors
Federal Data Catalog link
altemisai.org
Uses personally identifiable information
No
Custom-developed code
Yes

Left blank in the record: Justification given, Privacy Impact Assessment, Demographic features used, Public source code, Pre-deployment testing, Impact assessment completed, Potential impacts identified, Independent review, Ongoing monitoring, Operator training, Fail-safe, Appeal process, Consultation with users and the public. Point of contact details are in the source file.

Source

Source: row 795 of 2025_individually_reported_AI_use_cases.csv in OMB's 2025 Federal Agency AI Use Case Inventory repository (summary as of April 13, 2026), read Nov 17, 2026. File SHA-256 a62721202ca4b110

Life areas: Energy and environment.

Records, not ratings. Every entry is what an agency reported to OMB, quoted as filed. The register does not test, rate or vouch for any system, and a record does not prove how a system is used day to day.