SI Money Map · Client

DUKE ENERGY CORPORATION and SI policy

DUKE ENERGY CORPORATION is the client on 7 federal lobbying reports that name SI issues, Q1 2025 to Q3 2026, disclosing $15.2M by the amount rule: $8.7M in 2025 and $6.5M in 2026 so far. It filed 7 reports for itself. Rank 29 of 1,245 clients. Read from LDA.gov, Nov 17, 2026. Amounts are filing totals for all issues on each filing.

Updated Nov 17, 2026Rank 297 SI filings

$15.2MReported, all quarters
7SI filings
7Quarters with filings
10Lobbyist IDs on SI

Over time

Quarter by quarter

Q1 2025 to Q3 2026. Q3 2026 reports were due Oct 20, 2026.

DUKE ENERGY CORPORATION: reported amount by quarterBy the amount rule: the in-house report when there is one, else the outside firms' reports.
$0$1M$2M$3MQ1 25: $2.8MQ2 25: $2.0MQ3 25: $1.9MQ4 25: $2.0MQ1 26: $2.0MQ2 26: $2.3MQ3 26: $2.2M$2.8M$2.2MQ1 25Q2 25Q3 25Q4 25Q1 26Q2 26Q3 26$0$1M$2M$3MQ1 25: $2.8MQ2 25: $2.0MQ3 25: $1.9MQ4 25: $2.0MQ1 26: $2.0MQ2 26: $2.3MQ3 26: $2.2M$2.8M$2.2MQ1 25Q3 25Q1 26Q3 26
SI filings and amounts by quarter. Counted: the in-house amount when DUKE ENERGY CORPORATION filed an SI report for itself that quarter, otherwise the outside firms' amounts. Subcontracts are never added.
QuarterFilingsIn-houseOutside firmsCounted
Q3 20261$2,190,000none$2,190,000
Q2 20261$2,280,000none$2,280,000
Q1 20261$2,050,000none$2,050,000
Q4 20251$2,030,000none$2,030,000
Q3 20251$1,920,000none$1,920,000
Q2 20251$1,980,000none$1,980,000
Q1 20251$2,790,000none$2,790,000

The filings

Every SI filing for DUKE ENERGY CORPORATION

Each LD-2 report with at least one issue line that names SI, newest first, with the link to the filing on LDA.gov. "SI lines" shows how many of the filing's issue lines name SI.

Amount: income reported by an outside firm, or expenses reported in-house, for all issues on the filing.
QuarterFiled byAmountSI linesIssue codes and billsSource
Q3 2026Q3, posted Oct 20, 2026
DUKE ENERGY CORPORATIONIn-house
$2,190,000
1 of 7
Energy/NuclearH.R. 1047, H.R. 10500, H.R. 2347, H.R. 3616, H.R. 3617, H.R. 3657, H.R. 3898, H.R. 5600 ...
Q2 20262A, posted Aug 5, 2026
DUKE ENERGY CORPORATIONIn-house
$2,280,000
1 of 7
Energy/NuclearH.R. 1047, H.R. 3616, H.R. 3617, H.R. 3657, H.R. 3898, H.R. 5600, H.R. 6336, H.R. 6529 ...
Q1 2026Q1, posted Apr 20, 2026
DUKE ENERGY CORPORATIONIn-house
$2,050,000
1 of 7
Energy/NuclearH.R. 1047, H.R. 3616, H.R. 3617, H.R. 3657, H.R. 3898, H.R. 5600, H.R. 6529, H.R. 7329 ...
Q4 20254A, posted Oct 19, 2026
DUKE ENERGY CORPORATIONIn-house
$2,030,000
1 of 7
Energy/NuclearH.R. 1047, H.R. 3617, H.R. 3657, H.R. 3843, H.R. 3898, H.R. 5600, H.R. 6529
Q3 2025Q3, posted Oct 20, 2025
DUKE ENERGY CORPORATIONIn-house
$1,920,000
1 of 5
Energy/NuclearH.R. 1047, H.R. 3617, H.R. 3657, H.R. 5600
Q2 2025Q2, posted Jul 21, 2025
DUKE ENERGY CORPORATIONIn-house
$1,980,000
1 of 5
Energy/Nuclear
Q1 20251A, posted Apr 21, 2025
DUKE ENERGY CORPORATIONIn-house
$2,790,000
1 of 5
Energy/Nuclear

In their own words

What the filings say

The SI issue lines, quoted as filed: newest first, repeats left out, long lines cut short. The words are the filers'; the filings are public records.

Names as filed
DUKE ENERGY CORPORATION
Issue codes
Energy/Nuclear (7)
Bills named
H.R. 1047 (5), H.R. 3617 (5), H.R. 3657 (5), H.R. 5600 (5), H.R. 3898 (4), H.R. 6529 (4), H.R. 3616 (3), H.R. 7329 (3), S. 1327 (3), S. 3034 (3), S. 3585 (3), S. 3947 (3)
  1. "H.R. 1047 & S. 465 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and ..."

    Energy/Nuclear, filed by DUKE ENERGY CORPORATION. The filing
  2. "H.R. 1047 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act ..."

    Energy/Nuclear, filed by DUKE ENERGY CORPORATION. The filing
  3. "Permitting reform (NEPA, CWA, transmission); Artificial intelligence resource adequacy; Load growth; Data center issues; Energy security issues; Resiliency; E.O. 14241 Coal Executive Order E.O. 14154 Unleashing American Energy E.O. 14156 Declaring a National ..."

    Energy/Nuclear, filed by DUKE ENERGY CORPORATION. The filing
  4. "Draft legislation on transmission - permitting reform; Artificial intelligence resource adequacy; Load growth; Data center issues; Energy security issues; Resiliency; Transmission and distribution issues; E.O. 14241 Coal Executive Order E.O. 14154 Unleashing ..."

    Energy/Nuclear, filed by DUKE ENERGY CORPORATION. The filing

Embed

Put this card on any page

A plain image that links back here, with its source printed on it. Free under CC BY 4.0. Filings, not influence. The SI Money Map shows what federal disclosure filings report: who paid for lobbying, which issues and bills the filings name, and what super PACs raised and spent. It does not show influence, intent or results, and it takes no side.

Copy the embed
<a href="https://tsio.si/money-map/duke-energy-corporation/"><img src="https://tsio.si/money-map/duke-energy-corporation/card.svg" width="480" height="240" alt="The SI Money Map: DUKE ENERGY CORPORATION, $15.2M reported on SI lobbying filings"></a>
SI Money Map card for DUKE ENERGY CORPORATION