Company File · Cloud and big tech · 4 desks
What the public record shows about Oracle and SI
The SI desks hold a public record on Oracle at 4 desks. It shows $16.2M reported on 48 federal lobbying filings that name SI issues (Q1 2025 to Q3 2026); 2 SEC filings that contain "artificial intelligence" in the last four full quarters; 5.88 GW of compute announced across 6 projects; 6 SI data center sites it owns or uses, 896 MW of IT power by Epoch AI's estimate. Each block below repeats one desk's record with its source and its date. A desk with no record for Oracle is left out. This file is a record, not a verdict.
A record, not a verdict. A Company File repeats what public records and the SI desks show about a company, each with its source and date. It does not judge a company, and a block that is missing means that desk holds no record for it, not that nothing exists.
The record
4 desks, one file
Jump to a block. Each one ends with the source it comes from, the day it was read and a link to the desk that keeps it.
- SEC filingsSI Exposure · tsio.si
- Federal lobbyingThe SI Money Map · tsio.si
- Compute announcedThe Gigawatt Ledger · siscto.si
- Compute in the groundThe Power Map and Heat Watch · siscto.si
SI Exposure · tsio.si
SEC filings
2 Filings naming "artificial intelligence"
0 Filings naming "super intelligence"
ORCL Ticker
Of the 15 10-K, 10-Q and 8-K filings Oracle Corp made from Q4 2025 to Q3 2026, 2 contain the words "artificial intelligence". 0 filings since January 2023 contain "super intelligence" or "superintelligence". See the filings by quarter.
Source: SEC EDGAR full text search, read Nov 11, 2026; the company's EDGAR filings. Words counted are the exact words searched. Desk: SI Exposure.
The SI Money Map · tsio.si
Federal lobbying
$16.2M Reported, all quarters
48 SI filings
42 Lobbyist IDs
#25 Rank among clients
Oracle is the client on 48 federal lobbying reports that name SI issues, Q1 2025 to Q3 2026. Those reports disclose $16.2M in total. Each amount is the filing total for all the issues on that filing: the law does not split lobbying money by issue. See every filing, bill and issue.
- 2025 $9.2M reported on SI filings
- 2026 $7.0M reported on SI filings
Source: LD-2 lobbying reports, LDA.gov, read Nov 17, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov. Desk: The SI Money Map.
The Gigawatt Ledger · siscto.si
Compute announced
5.88 GW Announced
6 Projects
The Gigawatt Ledger lists 6 compute projects that name Oracle as an operator, with 5.88 GW announced in total. Public evidence puts 1.15 GW to 1.15 GW of that in operation. A project with several operators counts in full for each of them.
- Stargate Shackelford County (Frontier) Shackelford County, Texas, United States · Under construction · 1.40 GW announced · operators: OpenAI, Oracle, Vantage Data Centers
- Stargate Michigan (Saline Township) Saline Township, Michigan, United States · Under construction · 1.38 GW announced · operators: OpenAI, Oracle, Related Digital
- Stargate Abilene Abilene, Texas, United States · Energized · 1.20 GW announced · operators: OpenAI, Oracle, Crusoe
- Stargate UAE Abu Dhabi, Abu Dhabi, United Arab Emirates · Under construction · 1.00 GW announced · operators: OpenAI, G42, Oracle
- Stargate Wisconsin (Port Washington, Lighthouse) Port Washington, Wisconsin, United States · Under construction · 902 MW announced · operators: OpenAI, Oracle, Vantage Data Centers
- Stargate Doña Ana County (Project Jupiter) Doña Ana County, New Mexico, United States · Under construction · no capacity figure announced · operators: OpenAI, Oracle, BorderPlex Digital Assets, STACK Infrastructure
Source: The Gigawatt Ledger on siscto.si, as of Nov 11, 2026: company announcements checked against public evidence. Desk: The Gigawatt Ledger on siscto.si.
The Power Map and Heat Watch · siscto.si
Compute in the ground
896 MW IT power, Epoch AI estimate
6 Sites
5.04 GW Planned
The Power Map lists 6 SI data center sites where Oracle is named as an owner or a user. Epoch AI estimates 896 MW of IT power across them today. A site with an owner and a user counts in full for both. Heat Watch reads the land surface temperature at 6 of them.
- OpenAI Stargate Abilene Abilene, Texas, United States · owner · operating · 824 MW IT power (Epoch AI, Nov 1, 2026) · Heat Watch
- Oracle Batam Batam, Riau Islands, Indonesia · owner · operating · 72 MW IT power (Epoch AI, May 6, 2026) · Heat Watch
- OpenAI Stargate Michigan Benton, Michigan, United States · owner · building · Heat Watch
- OpenAI Stargate New Mexico Santa Teresa, New Mexico, United States · owner · building · Heat Watch
- OpenAI Stargate Shackelford Abilene, Texas, United States · owner · building · Heat Watch
- OpenAI Stargate Wisconsin Port Washington, Wisconsin, United States · owner · building · Heat Watch
Source: Epoch AI, AI data centers, CC BY 4.0, retrieved Nov 10, 2026; power figures are Epoch AI's estimates. Heat Watch as of Nov 17, 2026. Desk: The Power Map and Heat Watch on siscto.si.
The SI 100
Number 7 in The SI 100
Oracle is number 7 of 18 in The SI 100, Q4 2026, with a score of 49.9 from 4 of the seven measures. The release was frozen on Nov 19, 2026; the figures in the blocks above can be newer.
<a href="https://tsio.si/companies/oracle/"><img src="https://tsio.si/si-100/badge/oracle.svg" alt="Oracle in The SI 100, Q4 2026" width="300" height="64"></a>The names this file joins
- Lobbying client names (LDA.gov)
- ORACLE; ORACLE AMERICA, INC.; ORACLE CORPORATION
- SEC filer
- ORACLE CORP (CIK 1341439, ticker ORCL)
- Matched as
- the pattern \bOracle\b on the owner, operator, user, vendor, developer and maker fields of the other desks
One company files, hires and builds under many names. The company name table maps them, and it is published in full on the method page. Spotted a wrong match or a missing record? Tell the team on Telegram or X @entersio with the source.
