Company File · Cloud and big tech · 10 desks
What the public record shows about Microsoft and SI
The SI desks hold a public record on Microsoft at 10 desks. It shows $16.9M reported on 102 federal lobbying filings that name SI issues (Q1 2025 to Q3 2026); 131 federal SI use cases naming it as a vendor in the 2025 inventory; 6 SEC filings that contain "artificial intelligence" in the last four full quarters; 1 SI app charted in 32 App Store storefronts; 1.13 GW of compute announced across 4 projects; 11 SI data center sites it owns or uses, 1.68 GW of IT power by Epoch AI's estimate; 1 SI feature pulled back after launch; 1 documented incident that name it as the developer; 6 tracked safety promises; 5 SI features in the Off Switch Directory. Each block below repeats one desk's record with its source and its date. A desk with no record for Microsoft is left out. This file is a record, not a verdict.
A record, not a verdict. A Company File repeats what public records and the SI desks show about a company, each with its source and date. It does not judge a company, and a block that is missing means that desk holds no record for it, not that nothing exists.
The record
10 desks, one file
Jump to a block. Each one ends with the source it comes from, the day it was read and a link to the desk that keeps it.
- SEC filingsSI Exposure · tsio.si
- Federal lobbyingThe SI Money Map · tsio.si
- Federal useThe Government SI Register · tsio.si
- Apps in the chartsThe SI App Chart · tsio.si
- Compute announcedThe Gigawatt Ledger · siscto.si
- Compute in the groundThe Power Map and Heat Watch · siscto.si
- Features pulled backSI Recalls · enterrsi.si
- Incidents on the recordThe rogue SI incident log · enterrsi.si
- Safety promisesThe Promise Tracker · enterrsi.si
- Off switchesThe Off Switch Directory · enterrsi.si
SI Exposure · tsio.si
SEC filings
6 Filings naming "artificial intelligence"
2 Filings naming "super intelligence"
MSFT Ticker
Of the 12 10-K, 10-Q and 8-K filings Microsoft Corp made from Q4 2025 to Q3 2026, 6 contain the words "artificial intelligence". 2 filings since January 2023 contain "super intelligence" or "superintelligence". The first filing that says "super intelligence" or "superintelligence": PX14A6G of Nov 12, 2025. See the filings by quarter.
Source: SEC EDGAR full text search, read Nov 11, 2026; the company's EDGAR filings. Words counted are the exact words searched. Desk: SI Exposure.
The SI Money Map · tsio.si
Federal lobbying
$16.9M Reported, all quarters
102 SI filings
76 Lobbyist IDs
#24 Rank among clients
Microsoft is the client on 102 federal lobbying reports that name SI issues, Q1 2025 to Q3 2026. Those reports disclose $16.9M in total. Each amount is the filing total for all the issues on that filing: the law does not split lobbying money by issue. See every filing, bill and issue.
- 2025 $9.4M reported on SI filings
- 2026 $7.5M reported on SI filings
Source: LD-2 lobbying reports, LDA.gov, read Nov 17, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov. Desk: The SI Money Map.
The Government SI Register · tsio.si
Federal use
131 Use cases naming it
21 Agencies
5 Marked high impact
The 2025 federal inventory lists 131 SI use cases whose vendor field names Microsoft, at 21 agencies: Department of Energy (59), Department of Justice (13), Department of Health and Human Services (8), Social Security Administration (7), Department of Homeland Security (6) and 16 more. The vendor field is free text written by each agency, and one use case can name several vendors.
- CISAChatDepartment of Homeland Security · DHS-2306 · Deployed · vendor field: "Microsoft" · source row 90
- OCFO Response Augmentation SuiteDepartment of Homeland Security · DHS-2296 · Deployed · vendor field: "Microsoft (OpenAI Azure Commercial Cloud offerings)" · source row 110
- OCFO Code Assist GPTDepartment of Homeland Security · DHS-2441 · Deployed · vendor field: "Microsoft (OpenAI part of Azure Commercial Cloud offerings)" · source row 111
- Executive Summary GPTDepartment of Homeland Security · DHS-2710 · Deployed · vendor field: "Microsoft (Azure Commercial OpenAI Cloud Offerings)" · source row 112
- Intelligent Document ProcessingDepartment of Homeland Security · DHS-2425 · Deployed · vendor field: "UiPath; Microsoft; Apryse; Personable Inc." · source row 158
- ESEC Inquiry (STORM) SummarizationDepartment of Homeland Security · DHS-2453 · Deployed · vendor field: "Microsoft" · source row 179
- Microsoft Bing ServiceDepartment of Energy · DOE-510 · Deployed · vendor field: "Microsoft" · source row 514
- Visual Studio EnterpriseDepartment of Energy · DOE-519 · Deployed · vendor field: "Microsoft" · source row 516
123 more are in the register: search the vendor name there.
Source: 2025 Federal Agency AI Use Case Inventory (OMB), read Nov 17, 2026; the vendor_name column, quoted as filed. Desk: The Government SI Register.
The SI App Chart · tsio.si
Apps in the charts
1 SI apps on the chart
32 Storefronts reached
175 Storefronts read
On Nov 19, 2026, at least one SI app whose App Store seller is Microsoft was in Apple's Top Free Apps chart in 32 of the 175 storefronts read. A rank is a chart position, not a download count.
- Microsoft Copilot Assistants and chat apps · in the top 100 of 32 storefronts · best rank #26 · number one in 0
Source: Apple Top Free Apps chart feeds, read Nov 19, 2026. Desk: The SI App Chart.
The Gigawatt Ledger · siscto.si
Compute announced
1.13 GW Announced
4 Projects
The Gigawatt Ledger lists 4 compute projects that name Microsoft as an operator, with 1.13 GW announced in total. Public evidence puts 1.00 GW to 1.30 GW of that in operation. A project with several operators counts in full for each of them.
- Abilene campus for Microsoft Abilene, Texas, United States · Under construction · 900 MW announced · operators: Microsoft, Crusoe
- Stargate Norway (Narvik) Narvik, Nordland, Norway · Under construction · 230 MW announced · operators: Nscale, Aker, OpenAI, Microsoft
- Microsoft Fairwater Atlanta Fayetteville, Georgia, United States · Energized · no capacity figure announced · operators: Microsoft
- Microsoft Fairwater Wisconsin Mount Pleasant, Wisconsin, United States · Partly energized · no capacity figure announced · operators: Microsoft
Source: The Gigawatt Ledger on siscto.si, as of Nov 11, 2026: company announcements checked against public evidence. Desk: The Gigawatt Ledger on siscto.si.
The Power Map and Heat Watch · siscto.si
Compute in the ground
1.68 GW IT power, Epoch AI estimate
11 Sites
3.40 GW Planned
The Power Map lists 11 SI data center sites where Microsoft is named as an owner or a user. Epoch AI estimates 1.68 GW of IT power across them today. A site with an owner and a user counts in full for both. Heat Watch reads the land surface temperature at 11 of them.
- Microsoft Fairwater Atlanta Fayetteville, Georgia, United States · owner and user · operating · 636 MW IT power (Epoch AI, Jun 14, 2026) · Heat Watch
- Microsoft Fairwater Wisconsin Mount Pleasant, Wisconsin, United States · owner and user · expanding · 369 MW IT power (Epoch AI, May 15, 2026) · Heat Watch
- Microsoft Goodyear Goodyear, Arizona, United States · owner and user · operating · 202 MW IT power (Epoch AI, Apr 27, 2026) · Heat Watch
- Microsoft Project Osmium Cumming, Iowa, United States · owner · operating · 190 MW IT power (Epoch AI, Jun 16, 2026) · Heat Watch
- Microsoft SAT40 San Antonio, Texas, United States · owner · operating · 75 MW IT power (Epoch AI, Feb 4, 2026) · Heat Watch
- Nebius Mantsala Mantsala, Uusimaa, Finland · user · expanding · 75 MW IT power (Epoch AI, Jun 29, 2026) · Heat Watch
- Microsoft-Nebius New Jersey Vineland, New Jersey, United States · user · operating · 50 MW IT power (Epoch AI, Jul 12, 2026) · Heat Watch
- Microsoft SAT14 San Antonio, Texas, United States · owner · operating · 47 MW IT power (Epoch AI, Mar 31, 2026) · Heat Watch
3 more sites are on the Power Map.
Source: Epoch AI, AI data centers, CC BY 4.0, retrieved Nov 10, 2026; power figures are Epoch AI's estimates. Heat Watch as of Nov 17, 2026. Desk: The Power Map and Heat Watch on siscto.si.
SI Recalls · enterrsi.si
Features pulled back
1 Features on SI Recalls
Jun 13, 2024 Latest
SI Recalls lists 1 SI feature from Microsoft that was pulled, paused, shelved or rolled back after launch. Each entry gives the date, what the company said and whether the feature came back. It records what happened to a feature. It does not judge the company.
- Windows: Recall Jun 13, 2024 · status on SI Recalls: Returned with changes · returned Apr 25, 2025
Source: SI Recalls on enterrsi.si, checked Nov 19, 2026; each recall lists its own sources. Desk: SI Recalls on enterrsi.si.
The rogue SI incident log · enterrsi.si
Incidents on the record
1 Documented incidents
Feb 16, 2023 Latest
The rogue SI incident log names Microsoft in the developer field of 1 documented incident. Each entry is an event with its sources: many come from the developer's own safety tests and reports. The log records what happened. It does not assign fault.
- Bing Chat insulted and threatened users soon after launch Feb 16, 2023 · level 1 of 5 · developer field: "Microsoft"
Source: the rogue SI incident log, updated Nov 8, 2026, as JSON; each incident lists its own sources. Desk: The rogue SI incident log on enterrsi.si.
The Promise Tracker · enterrsi.si
Safety promises
6 Promises tracked
1 Kept
3 In progress
2 No evidence yet
The Promise Tracker follows 6 public safety promises by Microsoft: 1 kept, 3 in progress, 2 no evidence yet. The tracker marks a promise Kept or Not met only when a public source reports it, and names that source. See each promise with its sources on the tracker.
- Test models inside and outside the company before release. Promised Jul 21, 2023, source: The White House (archived) · status on the tracker: No evidence yet
- Publish a safety framework for severe risks before the February 2025 summit in France. Promised May 21, 2024, source: UK Department for Science, Innovation and Technology · status on the tracker: Kept, per METR, Nov 10, 2026
- Follow the Safety and Security chapter of the EU General-Purpose AI Code of Practice for its most capable models. Promised Aug 1, 2025, source: European Commission · status on the tracker: In progress
- Build superintelligence only within limits that keep humans in control. Promised Nov 6, 2025, source: Microsoft AI · status on the tracker: In progress
- Pause development and deployment of a model whose risk it cannot sufficiently mitigate. Promised Feb 13, 2026, source: Microsoft · status on the tracker: In progress
- Publish each covered model's evaluations and its risk classification. Promised Feb 13, 2026, source: Microsoft · status on the tracker: No evidence yet
Source: The Promise Tracker on enterrsi.si, checked Nov 10, 2026; the statuses are the tracker's, each with its own source. Desk: The Promise Tracker on enterrsi.si.
The Off Switch Directory · enterrsi.si
Off switches
5 SI features listed
3 Off switch documented
2 Partial off only
The Off Switch Directory lists 5 SI features in Microsoft's products and says, from the maker's own help pages, whether each can be turned off and how.
- Word, Excel and PowerPoint: Copilot Partial off only
- Outlook: Copilot Off switch documented
- Copilot app: Microsoft Copilot Off switch documented
- Windows: Recall Off switch documented
- Microsoft Edge: Copilot Partial off only
Source: The Off Switch Directory on enterrsi.si, checked Nov 17, 2026; every step is from the maker's own help page. Desk: The Off Switch Directory on enterrsi.si.
The SI 100
Number 4 in The SI 100
Microsoft is number 4 of 18 in The SI 100, Q4 2026, with a score of 72.3 from 6 of the seven measures. The release was frozen on Nov 19, 2026; the figures in the blocks above can be newer.
<a href="https://tsio.si/companies/microsoft/"><img src="https://tsio.si/si-100/badge/microsoft.svg" alt="Microsoft in The SI 100, Q4 2026" width="300" height="64"></a>The names this file joins
- Lobbying client names (LDA.gov)
- MICROSOFT; MICROSOFT CORP.; MICROSOFT CORPORATION
- SEC filer
- MICROSOFT CORP (CIK 789019, ticker MSFT)
- Matched as
- the pattern \bMicrosoft\b|\bAzure\b on the owner, operator, user, vendor, developer and maker fields of the other desks
One company files, hires and builds under many names. The company name table maps them, and it is published in full on the method page. Spotted a wrong match or a missing record? Tell the team on Telegram or X @entersio with the source.
