What the public record shows about G42 and Core42 and SI

The SI desks hold a public record on G42 and Core42 at 2 desks. It shows 1.44 GW of compute announced across 2 projects; 2 SI data center sites it owns or uses, 58 MW of IT power by Epoch AI's estimate. Each block below repeats one desk's record with its source and its date. A desk with no record for G42 and Core42 is left out. This file is a record, not a verdict.

2 of 11 desks4 recordsThe SI 100 not rankedMethod

2Desks with a record
4Records joined
2SI 100 measures with data

A record, not a verdict. A Company File repeats what public records and the SI desks show about a company, each with its source and date. It does not judge a company, and a block that is missing means that desk holds no record for it, not that nothing exists.

The record

2 desks, one file

Jump to a block. Each one ends with the source it comes from, the day it was read and a link to the desk that keeps it.

The Gigawatt Ledger · siscto.si

Compute announced

1.44 GW Announced

2 Projects

The Gigawatt Ledger lists 2 compute projects that name G42 and Core42 as an operator, with 1.44 GW announced in total. Public evidence puts 268 MW to 268 MW of that in operation. A project with several operators counts in full for each of them.

  • Stargate UAE Abu Dhabi, Abu Dhabi, United Arab Emirates · Under construction · 1.00 GW announced · operators: OpenAI, G42, Oracle
  • Lake Mariner Barker, New York, United States · Partly energized · 440 MW announced · operators: Fluidstack, TeraWulf, Core42, Anthropic

Source: The Gigawatt Ledger on siscto.si, as of Nov 11, 2026: company announcements checked against public evidence. Desk: The Gigawatt Ledger on siscto.si.

The Power Map and Heat Watch · siscto.si

Compute in the ground

58 MW IT power, Epoch AI estimate

2 Sites

1.00 GW Planned

The Power Map lists 2 SI data center sites where G42 and Core42 is named as an owner or a user. Epoch AI estimates 58 MW of IT power across them today. A site with an owner and a user counts in full for both. Heat Watch reads the land surface temperature at 2 of them.

Source: Epoch AI, AI data centers, CC BY 4.0, retrieved Nov 10, 2026; power figures are Epoch AI's estimates. Heat Watch as of Nov 17, 2026. Desk: The Power Map and Heat Watch on siscto.si.

The SI 100

Not ranked in The SI 100

G42 and Core42 is not ranked in The SI 100, Q4 2026. A company is ranked when it has data on at least 3 of the seven measures; this file has data on 2. That is a statement about what the desks cover, not about the company.

Compute in the ground58 MW weight 20
Compute announced1.44 GW weight 15
App reachNo record weight 15
HiringNo record weight 15
Lobbying on SINo record weight 15
Federal useNo record weight 10
SEC filingsNo record weight 10

The ranking · How it is made

The names this file joins

Matched as
the pattern \bG42\b|\bCore42\b on the owner, operator, user, vendor, developer and maker fields of the other desks

One company files, hires and builds under many names. The company name table maps them, and it is published in full on the method page. Spotted a wrong match or a missing record? Tell the team on Telegram or X @entersio with the source.