Company File · Cloud and big tech · 4 desks
What the public record shows about CoreWeave and SI
The SI desks hold a public record on CoreWeave at 4 desks. It shows 302 open jobs on its own job board (Nov 12, 2026); $1.0M reported on 17 federal lobbying filings that name SI issues (Q1 2025 to Q3 2026); 860 MW of compute announced across 4 projects; 9 SI data center sites it owns or uses, 679 MW of IT power by Epoch AI's estimate. Each block below repeats one desk's record with its source and its date. A desk with no record for CoreWeave is left out. This file is a record, not a verdict.
A record, not a verdict. A Company File repeats what public records and the SI desks show about a company, each with its source and date. It does not judge a company, and a block that is missing means that desk holds no record for it, not that nothing exists.
The record
4 desks, one file
Jump to a block. Each one ends with the source it comes from, the day it was read and a link to the desk that keeps it.
- Open jobsSI Jobs · tsio.si
- Federal lobbyingThe SI Money Map · tsio.si
- Compute announcedThe Gigawatt Ledger · siscto.si
- Compute in the groundThe Power Map and Heat Watch · siscto.si
SI Jobs · tsio.si
Open jobs
302 Open jobs
Nov 12, 2026 Read
CoreWeave listed 302 open jobs on its own public job board when the SI Jobs desk read it. Every job links to the employer's own posting. See every job by role and place.
Source: CoreWeave job board on Greenhouse, read Nov 12, 2026. Desk: SI Jobs.
The SI Money Map · tsio.si
Federal lobbying
$1.0M Reported, all quarters
17 SI filings
15 Lobbyist IDs
#298 Rank among clients
CoreWeave is the client on 17 federal lobbying reports that name SI issues, Q1 2025 to Q3 2026. Those reports disclose $1.0M in total. Each amount is the filing total for all the issues on that filing: the law does not split lobbying money by issue. See every filing, bill and issue.
- 2025 $480K reported on SI filings
- 2026 $550K reported on SI filings
Source: LD-2 lobbying reports, LDA.gov, read Nov 17, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov. Desk: The SI Money Map.
The Gigawatt Ledger · siscto.si
Compute announced
860 MW Announced
4 Projects
The Gigawatt Ledger lists 4 compute projects that name CoreWeave as an operator, with 860 MW announced in total. Public evidence puts 330 MW to 437 MW of that in operation. A project with several operators counts in full for each of them.
- Polaris Forge 1 Ellendale, North Dakota, United States · Partly energized · 400 MW announced · operators: CoreWeave, Applied Digital
- Denton Denton, Texas, United States · Energized · 260 MW announced · operators: CoreWeave, Core Scientific
- Lancaster Lancaster, Pennsylvania, United States · Under construction · 100 MW announced · operators: CoreWeave, Chirisa Technology Parks, Machine Investment Group
- Muskogee Muskogee, Oklahoma, United States · Under construction · 100 MW announced · operators: CoreWeave, Core Scientific
Source: The Gigawatt Ledger on siscto.si, as of Nov 11, 2026: company announcements checked against public evidence. Desk: The Gigawatt Ledger on siscto.si.
The Power Map and Heat Watch · siscto.si
Compute in the ground
679 MW IT power, Epoch AI estimate
9 Sites
1.57 GW Planned
The Power Map lists 9 SI data center sites where CoreWeave is named as an owner or a user. Epoch AI estimates 679 MW of IT power across them today. A site with an owner and a user counts in full for both. Heat Watch reads the land surface temperature at 9 of them.
- CoreWeave Denton TX Denton, Texas, United States · owner · expanding · 262 MW IT power (Epoch AI, Sep 1, 2026) · Heat Watch
- Coreweave Helios Afton, Texas, United States · owner · expanding · 132 MW IT power (Epoch AI, Aug 30, 2026) · Heat Watch
- CoreWeave Chester VA Chester, Virginia, United States · owner · expanding · 82 MW IT power (Epoch AI, May 20, 2026) · Heat Watch
- CoreWeave Ellendale ND Ellendale, North Dakota, United States · owner · expanding · 68 MW IT power (Epoch AI, Jun 30, 2026) · Heat Watch
- CoreWeave Marble NC Marble, North Carolina, United States · owner · operating · 65 MW IT power (Epoch AI, May 6, 2026) · Heat Watch
- CoreWeave Norway Øvrebø, Agder, Norway · owner · operating · 42 MW IT power (Epoch AI, Aug 15, 2026) · Heat Watch
- CoreWeave Dalton 1 & 2 Dalton, Georgia, United States · owner · operating · 28 MW IT power (Epoch AI, Feb 20, 2026) · Heat Watch
- CoreWeave Lancaster Greenfield site Lancaster, Pennsylvania, United States · owner · building · Heat Watch
1 more sites are on the Power Map.
Source: Epoch AI, AI data centers, CC BY 4.0, retrieved Nov 10, 2026; power figures are Epoch AI's estimates. Heat Watch as of Nov 17, 2026. Desk: The Power Map and Heat Watch on siscto.si.
The SI 100
Number 6 in The SI 100
CoreWeave is number 6 of 18 in The SI 100, Q4 2026, with a score of 52.1 from 4 of the seven measures. The release was frozen on Nov 19, 2026; the figures in the blocks above can be newer.
<a href="https://tsio.si/companies/coreweave/"><img src="https://tsio.si/si-100/badge/coreweave.svg" alt="CoreWeave in The SI 100, Q4 2026" width="300" height="64"></a>The names this file joins
- Lobbying client names (LDA.gov)
- COREWEAVE; COREWEAVE, INC.
- Job board
- CoreWeave (https://job-boards.greenhouse.io/coreweave)
- Matched as
- the pattern \bCoreWeave\b on the owner, operator, user, vendor, developer and maker fields of the other desks
One company files, hires and builds under many names. The company name table maps them, and it is published in full on the method page. Spotted a wrong match or a missing record? Tell the team on Telegram or X @entersio with the source.