# HR Job Postings | DOE High Impact SI

> Department of Energy: "HR Job Postings", a high impact SI use case at the pre-deployment stage, quoted from the 2025 federal inventory. Sourced and dated.

Source: https://tsio.si/gov-register/case/doe-630/
Updated: 2026-11-19
Publisher: The SI Observatory (tsio.si), run by the SI community, built by Codeflex

1. [Home](https://tsio.si/)
2. [Government SI Register](https://tsio.si/gov-register/)
3. [Department of Energy](https://tsio.si/gov-register/doe/)
4. HR Job Postings

Government SI Register · DOE · High impact

# HR Job Postings

**The Department of Energy lists "HR Job Postings" in the 2025 federal inventory as a high impact SI use case at the pre-deployment stage, in NE INL - NE Idaho National Laboratory (NE).** In the agency's words, the problem it is meant to solve: "Generic or ineffective job postings" Every field below is quoted as filed.

ID **DOE-630** · Stage **Pre-deployment** · Source row **626**

The full record

[All DOE use cases](https://tsio.si/gov-register/doe/)

The record, as filed

## Every field the agency reported

- **Bureau or component**: NE INL - NE Idaho National Laboratory (NE)
- **Stage**: Pre-deployment
- **High impact status**: High-impact
- **Justification given**: Not available
- **Topic area**: HR
- **Technology type**: Generative AI
- **Problem it is meant to solve**: Generic or ineffective job postings
- **Expected benefits**: Enhances applicant diversity and job match quality by optimizing language and structure in postings, improving recruitment outcomes.
- **What the system outputs**: Improved job postings
- **Operational or pilot start**: 2025-12-01 00:00:00
- **How it was built or bought**: In-house Development
- **Authorization to Operate**: Yes
- **System name**: api.hpc.inl.gov
- **Federal Data Catalog link**: Not available
- **Uses personally identifiable information**: No
- **Custom-developed code**: Yes
- **Public source code**: Not available

Left blank in the record: Vendors, Data used to train, tune or evaluate, Privacy Impact Assessment, Demographic features used, Pre-deployment testing, Impact assessment completed, Potential impacts identified, Independent review, Ongoing monitoring, Operator training, Fail-safe, Appeal process, Consultation with users and the public. Point of contact details are in the source file.

Source

Source: row 626 of [2025_individually_reported_AI_use_cases.csv](https://github.com/ombegov/2025-Federal-Agency-AI-Use-Case-Inventory/blob/main/Data/2025_individually_reported_AI_use_cases.csv) in OMB's [2025 Federal Agency AI Use Case Inventory](https://github.com/ombegov/2025-Federal-Agency-AI-Use-Case-Inventory) repository (summary as of April 13, 2026), read Nov 17, 2026. File SHA-256 `a62721202ca4b110`

Life areas: [Government operations](https://tsio.si/gov-register/area/government-operations/).

**Records, not ratings.** Every entry is what an agency reported to OMB, quoted as filed. The register does not test, rate or vouch for any system, and a record does not prove how a system is used day to day.

Other high impact cases at the DOE

- [Custom GenAI for eVinci Microreactor Engineering (MauroGPT)](https://tsio.si/gov-register/case/doe-534/) Pilot
- [Nuclear Safety Analysis](https://tsio.si/gov-register/case/doe-559/) Pilot
- [Custom GenAI for Advanced Reactor Development (LotusAI)](https://tsio.si/gov-register/case/doe-591/) Pilot
- [Custom GenAI for Advanced Reactor Development (RickoverAI)](https://tsio.si/gov-register/case/doe-609/) Pilot
- [Critical Materials](https://tsio.si/gov-register/case/doe-650/) Pre-deployment
- [Advanced Fuels Campaign](https://tsio.si/gov-register/case/doe-652/) Pilot
- [ORNL: Foundational AI Research](https://tsio.si/gov-register/case/doe-328/) Pre-deployment
- [ORNL: AI for Materials Science](https://tsio.si/gov-register/case/doe-329/) Pre-deployment
- [ORNL: AI for Experimental Facilities Operations](https://tsio.si/gov-register/case/doe-330/) Pre-deployment
- [ORNL: AI for Transportation and Mobility](https://tsio.si/gov-register/case/doe-331/) Pre-deployment
- [ORNL: AI for Energy Generation and Distribution](https://tsio.si/gov-register/case/doe-333/) Pre-deployment
- [ORNL: AI for Advanced Manufacturing](https://tsio.si/gov-register/case/doe-334/) Pre-deployment
