The Debt Clock · Chip makers · Q3 2026

# What Micron Technology borrows for the build

**Micron Technology carried $5.18 billion of debt on its balance sheet on Sep 3, 2026**, as its 10-K filed Oct 9, 2026 states it, against $14.6 billion a year earlier. Its cash flow statements show no new borrowing since Jan 1, 2026. Its lease note states $1.13 billion of leases signed but not yet started on Nov 27, 2025: commitments, not debt. On the [Capex Clock](https://tsio.si/capex-clock/micron/) it paid $11.1 billion for property and equipment in its latest reported quarter.

Debt **$5.18B** · Borrowed in 2026 **$0** · Leases not started **$1.13B** · [Method](https://tsio.si/debt-clock/#method)

Every quarter

[All 21 companies](https://tsio.si/debt-clock/)

[Capex Clock](https://tsio.si/capex-clock/micron/)

[Company File](https://tsio.si/companies/micron/)

- **Debt on Sep 3, 2026**: $5.18B
- **A year earlier, Aug 28, 2025**: $14.6B
- **Borrowed since Jan 1, 2026**: $0
- **Leases signed, not yet started**: $1.13B
- **Capex, Q3 2026**: $11.1B

**Three measures, never added together.** Debt is what the balance sheet carries. Borrowed is the cash a company raised from new debt, as its cash flow statement reports it. Leases signed but not yet started are commitments the lease note states: they are not debt and not on the balance sheet until each lease starts. None of it is all SI.

Debt by quarter

## 15 quarter ends from the balance sheets

Each figure adds the borrowing lines of the balance sheet in the 10-Q or 10-K that first states that date. The Capex Clock column is the same quarter's cash paid for property and equipment.

*Chart: Micron Technology: debt on the balance sheet at each quarter end. 15 quarter ends, Mar 2, 2023 to Sep 3, 2026; the latest is $5.18B.*

| Quarter end | Debt | The lines added | Capex in the quarter | Filing |
|---|---|---|---|---|
| **Sep 3, 2026** Q3 2026 | **$5.18B** | $4.69B `LongTermDebtAndCapitalLeaseObligations`, $491M `DebtCurrent` The element includes finance lease obligations. | $11.1B | [10-K, filed Oct 9, 2026](https://www.sec.gov/Archives/edgar/data/723125/000072312526000023/0000723125-26-000023-index.htm) |
| **May 28, 2026** Q2 2026 | **$5.72B** | $5.14B `LongTermDebtAndCapitalLeaseObligations`, $582M `DebtCurrent` The element includes finance lease obligations. | $7.83B | [10-Q, filed Jun 25, 2026](https://www.sec.gov/Archives/edgar/data/723125/000072312526000015/0000723125-26-000015-index.htm) |
| **Feb 26, 2026** Q1 2026 | **$10.1B** | $9.56B `LongTermDebtAndCapitalLeaseObligations`, $585M `DebtCurrent` The element includes finance lease obligations. | $6.39B | [10-Q, filed Mar 19, 2026](https://www.sec.gov/Archives/edgar/data/723125/000072312526000006/0000723125-26-000006-index.htm) |
| **Nov 27, 2025** Q4 2025 | **$11.8B** | $11.2B `LongTermDebtAndCapitalLeaseObligations`, $569M `DebtCurrent` The element includes finance lease obligations. | $5.39B | [10-Q, filed Dec 18, 2025](https://www.sec.gov/Archives/edgar/data/723125/000072312525000046/0000723125-25-000046-index.htm) |
| **Aug 28, 2025** Q3 2025 | **$14.6B** | $14.0B `LongTermDebtAndCapitalLeaseObligations`, $560M `DebtCurrent` The element includes finance lease obligations. | $5.66B | [10-K, filed Oct 3, 2025](https://www.sec.gov/Archives/edgar/data/723125/000072312525000028/0000723125-25-000028-index.htm) |
| **May 29, 2025** Q2 2025 | **$15.5B** | $15.0B `LongTermDebtAndCapitalLeaseObligations`, $538M `DebtCurrent` The element includes finance lease obligations. | $2.94B | [10-Q, filed Jun 26, 2025](https://www.sec.gov/Archives/edgar/data/723125/000072312525000021/0000723125-25-000021-index.htm) |
| **Feb 27, 2025** Q1 2025 | **$14.4B** | $13.9B `LongTermDebtAndCapitalLeaseObligations`, $504M `DebtCurrent` The element includes finance lease obligations. | $4.05B | [10-Q, filed Mar 21, 2025](https://www.sec.gov/Archives/edgar/data/723125/000072312525000009/0000723125-25-000009-index.htm) |
| **Nov 28, 2024** Q4 2024 | **$13.8B** | $13.3B `LongTermDebtAndCapitalLeaseObligations`, $533M `DebtCurrent` The element includes finance lease obligations. | $3.21B | [10-Q, filed Dec 19, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000047/0000723125-24-000047-index.htm) |
| **Aug 29, 2024** Q3 2024 | **$13.4B** | $13.0B `LongTermDebtAndCapitalLeaseObligations`, $431M `DebtCurrent` The element includes finance lease obligations. | $3.12B | [10-K, filed Oct 4, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000027/0000723125-24-000027-index.htm) |
| **May 30, 2024** Q2 2024 | **$13.3B** | $12.9B `LongTermDebtAndCapitalLeaseObligations`, $398M `DebtCurrent` The element includes finance lease obligations. | $2.09B | [10-Q, filed Jun 27, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000019/0000723125-24-000019-index.htm) |
| **Feb 29, 2024** Q1 2024 | **$13.7B** | $13.4B `LongTermDebtAndCapitalLeaseObligations`, $344M `DebtCurrent` The element includes finance lease obligations. | $1.38B | [10-Q, filed Mar 21, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000007/0000723125-24-000007-index.htm) |
| **Nov 30, 2023** Q4 2023 | **$13.5B** | $12.6B `LongTermDebtAndCapitalLeaseObligations`, $908M `DebtCurrent` The element includes finance lease obligations. | $1.80B | [10-Q, filed Dec 21, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000077/0000723125-23-000077-index.htm) |
| **Aug 31, 2023** Q3 2023 | **$13.3B** | $13.1B `LongTermDebtAndCapitalLeaseObligations`, $278M `DebtCurrent` The element includes finance lease obligations. | $1.46B | [10-K, filed Oct 6, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000054/0000723125-23-000054-index.htm) |
| **Jun 1, 2023** Q2 2023 | **$13.2B** | $13.0B `LongTermDebtAndCapitalLeaseObligations`, $259M `DebtCurrent` The element includes finance lease obligations. | $1.56B | [10-Q, filed Jun 29, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000041/0000723125-23-000041-index.htm) |
| **Mar 2, 2023** Q1 2023 | **$12.3B** | $12.0B `LongTermDebtAndCapitalLeaseObligations`, $237M `DebtCurrent` The element includes finance lease obligations. | $2.21B | [10-Q, filed Mar 29, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000022/0000723125-23-000022-index.htm) |

Every quarter end since the first quarter of 2023, newest first. Amounts are US dollars as filed; each line names its reporting element.

Borrowed

## $0 raised from new borrowing since Jan 1, 2026

The cash the company raised from new debt, from the financing section of its cash flow statement. A quarter is this year to date minus the last one. Element: `us-gaap:ProceedsFromIssuanceOfLongTermDebt` (Proceeds from Issuance of Long-term Debt).

| Quarter | Borrowed | How it is made | Filing |
|---|---|---|---|
| **Q3 2026** May 29, 2026 to Sep 3, 2026 | **$0** | Year to date $0 minus $0 | [10-K, filed Oct 9, 2026](https://www.sec.gov/Archives/edgar/data/723125/000072312526000023/0000723125-26-000023-index.htm) |
| **Q2 2026** Feb 27, 2026 to May 28, 2026 | **$0** | Year to date $0 minus $0 | [10-Q, filed Jun 25, 2026](https://www.sec.gov/Archives/edgar/data/723125/000072312526000015/0000723125-26-000015-index.htm) |
| **Q3 2025** May 30, 2025 to Aug 28, 2025 | **$0** | Year to date $4.43B minus $4.43B | [10-K, filed Oct 3, 2025](https://www.sec.gov/Archives/edgar/data/723125/000072312525000028/0000723125-25-000028-index.htm) |
| **Q2 2025** Feb 28, 2025 to May 29, 2025 | **$1.75B** | Year to date $4.43B minus $2.68B | [10-Q, filed Jun 26, 2025](https://www.sec.gov/Archives/edgar/data/723125/000072312525000021/0000723125-25-000021-index.htm) |
| **Q3 2024** May 31, 2024 to Aug 29, 2024 | **$0** | Year to date $999M minus $999M | [10-K, filed Oct 4, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000027/0000723125-24-000027-index.htm) |
| **Q2 2024** Mar 1, 2024 to May 30, 2024 | **$0** | Year to date $999M minus $999M | [10-Q, filed Jun 27, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000019/0000723125-24-000019-index.htm) |
| **Q1 2024** Dec 1, 2023 to Feb 29, 2024 | **$999M** | Year to date $999M minus $0 | [10-Q, filed Mar 21, 2024](https://www.sec.gov/Archives/edgar/data/723125/000072312524000007/0000723125-24-000007-index.htm) |
| **Q4 2023** Sep 1, 2023 to Nov 30, 2023 | **$0** | Year to date $0, the first of the fiscal year | [10-Q, filed Dec 21, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000077/0000723125-23-000077-index.htm) |
| **Q3 2023** Jun 2, 2023 to Aug 31, 2023 | **$0** | Year to date $6.72B minus $6.72B | [10-K, filed Oct 6, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000054/0000723125-23-000054-index.htm) |
| **Q2 2023** Mar 3, 2023 to Jun 1, 2023 | **$1.50B** | Year to date $6.72B minus $5.22B | [10-Q, filed Jun 29, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000041/0000723125-23-000041-index.htm) |
| **Q1 2023** Dec 2, 2022 to Mar 2, 2023 | **$1.87B** | Year to date $5.22B minus $3.35B | [10-Q, filed Mar 29, 2023](https://www.sec.gov/Archives/edgar/data/723125/000072312523000022/0000723125-23-000022-index.htm) |

Cash raised from new borrowing by quarter since 2023, newest first. A quarter with no figure in the filings is not shown and not estimated.

Leases signed, not yet started

## $1.13B as of Nov 27, 2025

Leases the company has signed that start later, as its lease note states the amount. They are commitments: they are not debt, and they are not on the balance sheet until each lease starts. The words are the company's own; the link opens the sentence in the filing.

| As of | Not yet started | What the filing says |
|---|---|---|
| **Nov 27, 2025** 10-Q filed Dec 18, 2025 | **$1.13B** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of November 27, 2025, excluded obligations consisted of $ 1.13 billion of finance lease obligations over a weighted-average period of 15 years for gas supply arrangements deemed to contain embedded leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312525000046/mu-20251127.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,to%20contain%20embedded%20leases.) |
| **Aug 28, 2025** 10-K filed Oct 3, 2025 | **$1.16B** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of August 28, 2025, excluded obligations consisted of $ 1.16 billion of finance lease obligations over a weighted-average period of 15 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312525000028/mu-20250828.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **May 29, 2025** 10-Q filed Jun 26, 2025 | **$1.02B** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of May 29, 2025, excluded obligations consisted of $ 1.02 billion of finance lease obligations over a weighted-average period of 14 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312525000021/mu-20250529.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Feb 27, 2025** 10-Q filed Mar 21, 2025 | **$860M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of February 27, 2025, excluded obligations consisted of $ 860 million of finance lease obligations over a weighted-average period of 14 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312525000009/mu-20250227.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Nov 28, 2024** 10-Q filed Dec 19, 2024 | **$901M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of November 28, 2024, excluded obligations consisted of $ 901 million of finance lease obligations over a weighted-average period of 14 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312524000047/mu-20241128.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Aug 29, 2024** 10-K filed Oct 4, 2024 | **$835M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of August 29, 2024, excluded obligations consisted of $ 835 million of finance lease obligations over a weighted-average period of 13 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312524000027/mu-20240829.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **May 30, 2024** 10-Q filed Jun 27, 2024 | **$704M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of May 30, 2024, excluded obligations consisted of $ 704 million of finance lease obligations over a weighted-average period of 14 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312524000019/mu-20240530.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Feb 29, 2024** 10-Q filed Mar 21, 2024 | **$670M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of February 29, 2024, excluded obligations consisted of $ 670 million of finance lease obligations over a weighted-average period of 14 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312524000007/mu-20240229.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Nov 30, 2023** 10-Q filed Dec 21, 2023 | **$122M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of November 30, 2023, excluded obligations consisted of $ 122 million of finance lease obligations over a weighted-average period of 8 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312523000077/mu-20231130.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Aug 31, 2023** 10-K filed Oct 6, 2023 | **$170M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of August 31, 2023, excluded obligations consisted of $ 170 million of finance lease obligations over a weighted-average period of 12 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312523000054/mu-20230831.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Jun 1, 2023** 10-Q filed Jun 29, 2023 | **$175M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of June 1, 2023, excluded obligations consisted of $ 175 million of estimated finance lease payments over a weighted-average period of 11 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312523000041/mu-20230601.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |
| **Mar 2, 2023** 10-Q filed Mar 29, 2023 | **$195M** | The table above excludes obligations for leases that have been executed but have not yet commenced. As of March 2, 2023, excluded obligations consisted of $ 195 million of estimated finance lease payments over a weighted-average period of 11 years for gas supply arrangements deemed to contain embedded leases and equipment leases. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/723125/000072312523000022/mu-20230302.htm#:~:text=The%20table%20above%20excludes%20obligations%20for,leases%20and%20equipment%20leases.) |

Every filing since 2023 that states the amount, newest first.

Notes and bonds

## 4 offerings filed since 2023

The notes each prospectus supplement or 8-K says were offered or issued, with the principal of each series in the currency the filing states. A later 8-K about the same notes is listed with its offering, not counted again.

| Filed | Notes | Principal | Filing |
|---|---|---|---|
| **Apr 25, 2025** 424B5 | 5.65% senior notes due 2032; 6.05% senior notes due 2035 | **$1.75B** | [The filing](https://www.sec.gov/Archives/edgar/data/723125/000110465925039497/tm2511594-4_424b5.htm) |
| **Jan 14, 2025** 424B5 | 5.80% senior notes due 2035 | **$1B** | [The filing](https://www.sec.gov/Archives/edgar/data/723125/000110465925003448/tm2425615-3_424b5.htm) |
| **Jan 11, 2024** 424B5 | 5.30% senior notes due 2031 | **$1B** | [The filing](https://www.sec.gov/Archives/edgar/data/723125/000110465924003379/tm242304-2_424b5.htm) |
| **Feb 8, 2023** 424B5 | 6.750% Senior Notes due 2029; 5.875% senior notes due 2033 | **$1.25B** | [The filing](https://www.sec.gov/Archives/edgar/data/723125/000110465923012093/tm2231337-2_424b5.htm) |

Offerings, newest first. Amounts are never converted between currencies.

Read it right

## What these figures are and are not

- **Debt** is the carrying amount of borrowings on the balance sheet: bonds, notes, loans and commercial paper, due later or within a year.
- **Lease liabilities are not in it.** Where a company's own debt line includes finance leases, the table says so.
- **Leases not yet started are commitments,** stated by the company in its lease note; they are not debt.
- **None of it is all SI.** Companies do not report an SI share of their borrowing.
- **No forecast and no rating.** The Debt Clock repeats what the filings state.

The lines in the filings

### Which elements are read

- **SEC filer**: MICRON TECHNOLOGY INC (CIK 723125)
- **Debt lines**: `us-gaap:LongTermDebtAndCapitalLeaseObligations` + `us-gaap:DebtCurrent`
- **Borrowing line**: `us-gaap:ProceedsFromIssuanceOfLongTermDebt`

The Capex Clock

**What Micron Technology spends**

$11.1B in Q3 2026, $60.2B since 2023.