# Meta Debt and Leases, From SEC Filings

> Meta debt, borrowing and leases not yet started, quarter by quarter from its SEC filings: $83.7B of debt at the latest quarter end. Free to cite.

Source: https://tsio.si/debt-clock/meta/
Updated: 2026-11-26
Publisher: The SI Observatory (tsio.si), run by the SI community, built by Codeflex

1. [Home](https://tsio.si/)
2. [The Debt Clock](https://tsio.si/debt-clock/)
3. Meta

The Debt Clock · Cloud and big tech · Q3 2026

# What Meta borrows for the build

**Meta carried $83.7 billion of debt on its balance sheet on Sep 30, 2026**, as its 10-Q filed Oct 22, 2026 states it, against $28.8 billion a year earlier. It raised $24.9 billion from new borrowing since Jan 1, 2026, by its cash flow statement. Its lease note states $355.7 billion of leases signed but not yet started on Sep 30, 2026: commitments, not debt. On the [Capex Clock](https://tsio.si/capex-clock/meta/) it paid $33.9 billion for property and equipment in its latest reported quarter.

Debt **$83.7B** · Borrowed in 2026 **$24.9B** · Leases not started **$355.7B** · [Method](https://tsio.si/debt-clock/#method)

Every quarter

[All 21 companies](https://tsio.si/debt-clock/)

[Capex Clock](https://tsio.si/capex-clock/meta/)

[Company File](https://tsio.si/companies/meta/)

- **Debt on Sep 30, 2026**: $83.7B
- **A year earlier, Sep 30, 2025**: $28.8B
- **Borrowed since Jan 1, 2026**: $24.9B
- **Leases signed, not yet started**: $355.7B
- **Capex, Q3 2026**: $33.9B

**Three measures, never added together.** Debt is what the balance sheet carries. Borrowed is the cash a company raised from new debt, as its cash flow statement reports it. Leases signed but not yet started are commitments the lease note states: they are not debt and not on the balance sheet until each lease starts. None of it is all SI.

Debt by quarter

## 15 quarter ends from the balance sheets

Each figure adds the borrowing lines of the balance sheet in the 10-Q or 10-K that first states that date. The Capex Clock column is the same quarter's cash paid for property and equipment.

*Chart: Meta: debt on the balance sheet at each quarter end. 15 quarter ends, Mar 31, 2023 to Sep 30, 2026; the latest is $83.7B.*

| Quarter end | Debt | The lines added | Capex in the quarter | Filing |
|---|---|---|---|---|
| **Sep 30, 2026** Q3 2026 | **$83.7B** | $80.9B `LongTermDebtNoncurrent`, $2.75B `LongTermDebtCurrent` | $33.9B | [10-Q, filed Oct 22, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026066773/0001628280-26-066773-index.htm) |
| **Jun 30, 2026** Q2 2026 | **$83.7B** | $83.7B `LongTermDebtNoncurrent` | $30.1B | [10-Q, filed Jul 30, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026050705/0001628280-26-050705-index.htm) |
| **Mar 31, 2026** Q1 2026 | **$58.7B** | $58.7B `LongTermDebtNoncurrent` | $19.0B | [10-Q, filed Apr 30, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026028526/0001628280-26-028526-index.htm) |
| **Dec 31, 2025** Q4 2025 | **$58.7B** | $58.7B `LongTermDebtNoncurrent`, $0 `LongTermDebtCurrent` | $21.4B | [10-K, filed Jan 29, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026003942/0001628280-26-003942-index.htm) |
| **Sep 30, 2025** Q3 2025 | **$28.8B** | $28.8B `LongTermDebtNoncurrent` | $18.8B | [10-Q, filed Oct 30, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000162828025047240/0001628280-25-047240-index.htm) |
| **Jun 30, 2025** Q2 2025 | **$28.8B** | $28.8B `LongTermDebtNoncurrent` | $16.5B | [10-Q, filed Jul 31, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000162828025036791/0001628280-25-036791-index.htm) |
| **Mar 31, 2025** Q1 2025 | **$28.8B** | $28.8B `LongTermDebtNoncurrent` | $12.9B | [10-Q, filed May 1, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000132680125000054/0001326801-25-000054-index.htm) |
| **Dec 31, 2024** Q4 2024 | **$28.8B** | $28.8B `LongTermDebtNoncurrent` | $14.4B | [10-K, filed Jan 30, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000132680125000017/0001326801-25-000017-index.htm) |
| **Sep 30, 2024** Q3 2024 | **$28.8B** | $28.8B `LongTermDebtNoncurrent` | $8.26B | [10-Q, filed Oct 31, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000081/0001326801-24-000081-index.htm) |
| **Jun 30, 2024** Q2 2024 | **$18.4B** | $18.4B `LongTermDebtNoncurrent` | $8.17B | [10-Q, filed Aug 1, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000069/0001326801-24-000069-index.htm) |
| **Mar 31, 2024** Q1 2024 | **$18.4B** | $18.4B `LongTermDebtNoncurrent` | $6.40B | [10-Q, filed Apr 25, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000049/0001326801-24-000049-index.htm) |
| **Dec 31, 2023** Q4 2023 | **$18.4B** | $18.4B `LongTermDebtNoncurrent` | $7.59B | [10-K, filed Feb 2, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000012/0001326801-24-000012-index.htm) |
| **Sep 30, 2023** Q3 2023 | **$18.4B** | $18.4B `LongTermDebtNoncurrent` | $6.50B | [10-Q, filed Oct 26, 2023](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000103/0001326801-23-000103-index.htm) |
| **Jun 30, 2023** Q2 2023 | **$18.4B** | $18.4B `LongTermDebtNoncurrent` | $6.13B | [10-Q, filed Jul 27, 2023](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000093/0001326801-23-000093-index.htm) |
| **Mar 31, 2023** Q1 2023 | **$9.93B** | $9.93B `LongTermDebtNoncurrent` | $6.82B | [10-Q, filed Apr 27, 2023](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000067/0001326801-23-000067-index.htm) |

Every quarter end since the first quarter of 2023, newest first. Amounts are US dollars as filed; each line names its reporting element.

Borrowed

## $24.9B raised from new borrowing since Jan 1, 2026

The cash the company raised from new debt, from the financing section of its cash flow statement. A quarter is this year to date minus the last one. Element: `us-gaap:ProceedsFromIssuanceOfLongTermDebt` (Proceeds from Issuance of Long-term Debt).

| Quarter | Borrowed | How it is made | Filing |
|---|---|---|---|
| **Jan 1, 2026 to Jun 30, 2026** stated only as a whole | **$24.9B** | The filing states these months together and no figure for the quarters before; it is counted whole, never split. | [10-Q, filed Jul 30, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026050705/0001628280-26-050705-index.htm) |
| **Q3 2026** Jul 1, 2026 to Sep 30, 2026 | **$0** | Year to date $24.9B minus $24.9B | [10-Q, filed Oct 22, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026066773/0001628280-26-066773-index.htm) |
| **Q4 2025** Oct 1, 2025 to Dec 31, 2025 | **$29.9B** | Year to date $29.9B minus $0 | [10-K, filed Jan 29, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000162828026003942/0001628280-26-003942-index.htm) |
| **Q3 2025** Jul 1, 2025 to Sep 30, 2025 | **$0** | Year to date $0 minus $0 | [10-Q, filed Oct 30, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000162828025047240/0001628280-25-047240-index.htm) |
| **Q4 2024** Oct 1, 2024 to Dec 31, 2024 | **$0** | Year to date $10.4B minus $10.4B | [10-K, filed Jan 30, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000132680125000017/0001326801-25-000017-index.htm) |
| **Q3 2024** Jul 1, 2024 to Sep 30, 2024 | **$10.4B** | Year to date $10.4B minus $0 | [10-Q, filed Oct 31, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000081/0001326801-24-000081-index.htm) |
| **Q4 2023** Oct 1, 2023 to Dec 31, 2023 | **$0** | Year to date $8.46B minus $8.46B | [10-K, filed Feb 2, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000012/0001326801-24-000012-index.htm) |
| **Q3 2023** Jul 1, 2023 to Sep 30, 2023 | **$0** | Year to date $8.46B minus $8.46B | [10-Q, filed Oct 26, 2023](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000103/0001326801-23-000103-index.htm) |

Cash raised from new borrowing by quarter since 2023, newest first. A quarter with no figure in the filings is not shown and not estimated.

Leases signed, not yet started

## $355.7B as of Sep 30, 2026

Leases the company has signed that start later, as its lease note states the amount. They are commitments: they are not debt, and they are not on the balance sheet until each lease starts. The words are the company's own; the link opens the sentence in the filing.

| As of | Not yet started | What the filing says |
|---|---|---|
| **Sep 30, 2026** 10-Q filed Oct 22, 2026 | **$355.7B** | In addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of September 30, 2026. These lease obligations were approximately $ 355.73 billion, consisting of data centers, energy-related infrastructure, colocations, and certain network infrastructure, which will commence during the remainder of 2026 through 2036 with lease terms ranging from greater than one year to 30 years. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000162828026066773/meta-20260930.htm#:~:text=In%20addition%20to%20the%20lease%20liabilities,year%20to%2030%20years.) |
| **Jun 30, 2026** 10-Q filed Jul 30, 2026 | **$279.0B** | In addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of June 30, 2026. These lease obligations were approximately $ 278.99 billion, consisting of data centers, colocations, and certain network infrastructure, which will commence during the remainder of 2026 through 2036 with lease terms ranging from greater than one year to 30 years. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000162828026050705/meta-20260630.htm#:~:text=In%20addition%20to%20the%20lease%20liabilities,year%20to%2030%20years.) |
| **Mar 31, 2026** 10-Q filed Apr 30, 2026 | **$182.9B** | In addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of March 31, 2026. These lease obligations were approximately $ 182.88 billion, consisting of data centers, colocations, and certain network infrastructure, which will commence during the remainder of 2026 and 2036 with lease terms ranging from greater than one year to 30 years. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000162828026028526/meta-20260331.htm#:~:text=In%20addition%20to%20the%20lease%20liabilities,year%20to%2030%20years.) |
| **Dec 31, 2025** 10-K filed Jan 29, 2026 | **$103.8B** | In addition to lease liabilities included in our consolidated balance sheets, we have leases that have not yet commenced, with total lease obligations of approximately $103.77 billion, mostly for data centers, colocations, and network infrastructure, as of December 31, 2025. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000162828026003942/meta-20251231.htm#:~:text=In%20addition%20to%20lease%20liabilities%20included,of%20December%2031%2C%202025.) |
| **Sep 30, 2025** 10-Q filed Oct 30, 2025 | **$58.1B** | In addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of September 30, 2025. These lease obligations were approximately $ 58.14 billion, mostly for data centers, colocations, and certain network infrastructure, which will commence between the remainder of 2025 and 2030. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000162828025047240/meta-20250930.htm#:~:text=In%20addition%20to%20the%20lease%20liabilities,of%202025%20and%202030.) |
| **Jun 30, 2025** 10-Q filed Jul 31, 2025 | **$52.6B** | In addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of June 30, 2025. These lease obligations were approximately $ 52.56 billion, mostly for data centers, certain network infrastructure, and colocations, which will commence between the remainder of 2025 and 2034. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000162828025036791/meta-20250630.htm#:~:text=In%20addition%20to%20the%20lease%20liabilities,of%202025%20and%202034.) |
| **Mar 31, 2025** 10-Q filed May 1, 2025 | **$35.3B** | In addition to the lease liabilities that are included on our balance sheet, we have operating and finance leases that have not yet commenced as of March 31, 2025. These lease obligations were approximately $ 35.27 billion, mostly for data centers, certain network infrastructure, and colocations, which will commence between the remainder of 2025 and 2034. [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680125000054/meta-20250331.htm#:~:text=In%20addition%20to%20the%20lease%20liabilities,of%202025%20and%202034.) |
| **Dec 31, 2024** 10-K filed Jan 30, 2025 | **$34.1B** | As of December 31, 2024, we have additional operating and finance leases, that have not yet commenced, with total lease obligations of approximately $ 34.12 billion, mostly for data centers, network infrastructure, and colocations. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680125000017/meta-20241231.htm#:~:text=As%20of%20December%2031%2C%202024%2C%20we,network%20infrastructure%2C%20and%20colocations.) |
| **Sep 30, 2024** 10-Q filed Oct 31, 2024 | **$18.5B** | As of September 30, 2024, we have additional operating leases, that have not yet commenced, with lease obligations of approximately $ 18.49 billion, mostly for data centers and colocations. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000081/meta-20240930.htm#:~:text=As%20of%20September%2030%2C%202024%2C%20we,data%20centers%20and%20colocations.) |
| **Jun 30, 2024** 10-Q filed Aug 1, 2024 | **$6.20B** | As of June 30, 2024, we have additional operating leases, that have not yet commenced, with lease obligations of approximately $ 6.20 billion mostly for data centers and colocations. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000069/meta-20240630.htm#:~:text=As%20of%20June%2030%2C%202024%2C%20we,data%20centers%20and%20colocations.) |
| **Mar 31, 2024** 10-Q filed Apr 25, 2024 | **$6.17B** | As of March 31, 2024, we have additional operating leases, that have not yet commenced, with lease obligations of approximately $ 6.17 billion mostly for data centers and colocations. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000049/meta-20240331.htm#:~:text=As%20of%20March%2031%2C%202024%2C%20we,data%20centers%20and%20colocations.) |
| **Dec 31, 2023** 10-K filed Feb 2, 2024 | **$7.07B** | As of December 31, 2023, we have additional operating and finance leases, that have not yet commenced, with lease obligations of approximately $ 7.07 billion and $ 1.37 billion, respectively, mostly for data centers, colocations, and network infrastructure. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680124000012/meta-20231231.htm#:~:text=As%20of%20December%2031%2C%202023%2C%20we,colocations%2C%20and%20network%20infrastructure.) |
| **Sep 30, 2023** 10-Q filed Oct 26, 2023 | **$7.51B** | As of September 30, 2023, we have additional operating and finance leases, that have not yet commenced, with lease obligations of approximately $ 7.51 billion and $ 1.23 billion, respectively, primarily for data centers, colocations, and network infrastructure. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000103/meta-20230930.htm#:~:text=As%20of%20September%2030%2C%202023%2C%20we,colocations%2C%20and%20network%20infrastructure.) |
| **Jun 30, 2023** 10-Q filed Jul 27, 2023 | **$9.62B** | As of June 30, 2023, we have additional operating and finance leases, that have not yet commenced, with lease obligations of approximately $ 9.62 billion and $ 1.25 billion, respectively, for data centers, colocations, network infrastructure and offices. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000093/meta-20230630.htm#:~:text=As%20of%20June%2030%2C%202023%2C%20we,network%20infrastructure%20and%20offices.) |
| **Mar 31, 2023** 10-Q filed Apr 27, 2023 | **$10.3B** | As of March 31, 2023, we have additional operating and finance leases, that have not yet commenced, with lease obligations of approximately $ 10.26 billion and $ 1.33 billion, respectively, for data centers, colocations, offices, and network infrastructure. Note 8, Leases [Read it in the filing](https://www.sec.gov/Archives/edgar/data/1326801/000132680123000067/meta-20230331.htm#:~:text=As%20of%20March%2031%2C%202023%2C%20we,offices%2C%20and%20network%20infrastructure.) |

Every filing since 2023 that states the amount, newest first.

Notes and bonds

## 6 offerings filed since 2023

The notes each prospectus supplement or 8-K says were offered or issued, with the principal of each series in the currency the filing states. A later 8-K about the same notes is listed with its offering, not counted again.

| Filed | Notes | Principal | Filing |
|---|---|---|---|
| **Nov 6, 2026** 424B5 | 4.300% Senior Notes due 2031; 4.650% Senior Notes due 2033; 4.900% Senior Notes due 2035; 5.400% Senior Notes due 2038; 6.050% Senior Notes due 2044; 6.400% Senior Notes due 2065 | **€9B** | [The filing](https://www.sec.gov/Archives/edgar/data/1326801/000119312526450754/d44678d424b5.htm) |
| **Nov 5, 2026** 424B5 | 5.850% Senior Notes due 2031; 6.250% Senior Notes due 2033; 6.550% Senior Notes due 2036; 7.350% Senior Notes due 2046; 7.500% Senior Notes due 2056 | **$15B** | [The filing](https://www.sec.gov/Archives/edgar/data/1326801/000119312526448015/d135326d424b5.htm) also [8-K filed Nov 5, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000119312526450074/d166273d8k.htm) |
| **May 1, 2026** 424B2 | 4.550% Senior Notes due 2031; 4.875% Senior Notes due 2033; 5.250% Senior Notes due 2036; 6.200% Senior Notes due 2046; 6.300% Senior Notes due 2056; 6.450% Senior Notes due 2066 | **$25B** | [The filing](https://www.sec.gov/Archives/edgar/data/1326801/000119312526201738/d109954d424b2.htm) also [8-K filed May 4, 2026](https://www.sec.gov/Archives/edgar/data/1326801/000119312526204128/d134616d8k.htm) |
| **Nov 3, 2025** 424B2 | 4.200% Senior Notes due 2030; 4.600% Senior Notes due 2032; 4.875% Senior Notes due 2035; 5.500% Senior Notes due 2045; 5.625% Senior Notes due 2055; 5.750% Senior Notes due 2065 | **$30B** | [The filing](https://www.sec.gov/Archives/edgar/data/1326801/000119312525261217/d762778d424b2.htm) also [8-K filed Nov 3, 2025](https://www.sec.gov/Archives/edgar/data/1326801/000119312525262593/d75422d8k.htm) |
| **Aug 8, 2024** 424B2 | 4.300% Senior Notes due 2029; 4.550% Senior Notes due 2031; 4.750% Senior Notes due 2034; 5.400% Senior Notes due 2054; 5.550% Senior Notes due 2064 | **$10.50B** | [The filing](https://www.sec.gov/Archives/edgar/data/1326801/000119312524197096/d874457d424b2.htm) also [8-K filed Aug 9, 2024](https://www.sec.gov/Archives/edgar/data/1326801/000119312524197873/d876862d8k.htm) |
| **May 2, 2023** 424B2 | 4.600% Senior Notes due 2028; 4.800% Senior Notes due 2030; 4.950% Senior Notes due 2033; 5.600% Senior Notes due 2053; 5.750% Senior Notes due 2063 | **$8.50B** | [The filing](https://www.sec.gov/Archives/edgar/data/1326801/000119312523132617/d495777d424b2.htm) also [8-K filed May 3, 2023](https://www.sec.gov/Archives/edgar/data/1326801/000119312523134410/d468942d8k.htm) |

Offerings, newest first. Amounts are never converted between currencies.

Read it right

## What these figures are and are not

- **Debt** is the carrying amount of borrowings on the balance sheet: bonds, notes, loans and commercial paper, due later or within a year.
- **Lease liabilities are not in it.** Where a company's own debt line includes finance leases, the table says so.
- **Leases not yet started are commitments,** stated by the company in its lease note; they are not debt.
- **None of it is all SI.** Companies do not report an SI share of their borrowing.
- **No forecast and no rating.** The Debt Clock repeats what the filings state.

The lines in the filings

### Which elements are read

- **SEC filer**: Meta Platforms, Inc. (CIK 1326801)
- **Debt lines**: `us-gaap:LongTermDebtNoncurrent` + `us-gaap:LongTermDebtCurrent`
- **Borrowing line**: `us-gaap:ProceedsFromIssuanceOfLongTermDebt`

The Capex Clock

**What Meta spends**

$33.9B in Q3 2026, $217.0B since 2023.

Open the Clock

The Revenue Line

**What Meta earns from SI**

The segment its filings tie to SI, where one exists.

Open the Line