# Vantage Data Centers: Company File on SI, Sourced

> The public record on Vantage Data Centers and SI in one file: 2.30 GW of compute announced across 2 projects. Sourced and dated. Free to cite.

Source: https://tsio.si/companies/vantage-data-centers/
Updated: 2026-11-19
Publisher: The SI Observatory (tsio.si), run by the SI community, built by Codeflex

1. [Home](https://tsio.si/)
2. [Company Files](https://tsio.si/companies/)
3. Vantage Data Centers

Company File · Compute and data centers · 1 desk

# What the public record shows about Vantage Data Centers and SI

**The SI desks hold a public record on Vantage Data Centers at 1 desk.** It shows 2.30 GW of compute announced across 2 projects. Each block below repeats one desk's record with its source and its date. A desk with no record for Vantage Data Centers is left out. This file is a record, not a verdict.

**1** of 11 desks · **2** records · The SI 100 **not ranked** · [Method](https://tsio.si/si-100/method/)

- **Desks with a record**: 1
- **Records joined**: 2
- **SI 100 measures with data**: 1

**A record, not a verdict.** A Company File repeats what public records and the SI desks show about a company, each with its source and date. It does not judge a company, and a block that is missing means that desk holds no record for it, not that nothing exists.

The record

## 1 desk, one file

Jump to a block. Each one ends with the source it comes from, the day it was read and a link to the desk that keeps it.

- Compute announcedThe Gigawatt Ledger · siscto.si

The Gigawatt Ledger · siscto.si

## Compute announced

**2.30 GW** Announced

**2** Projects

The Gigawatt Ledger lists 2 compute projects that name Vantage Data Centers as an operator, with 2.30 GW announced in total. A project with several operators counts in full for each of them.

- **[Stargate Shackelford County (Frontier)](https://siscto.si/ledger/stargate-shackelford-county/)** Shackelford County, Texas, United States · Under construction · 1.40 GW announced · operators: OpenAI, Oracle, Vantage Data Centers
- **[Stargate Wisconsin (Port Washington, Lighthouse)](https://siscto.si/ledger/stargate-port-washington/)** Port Washington, Wisconsin, United States · Under construction · 902 MW announced · operators: OpenAI, Oracle, Vantage Data Centers

Source: [The Gigawatt Ledger](https://siscto.si/ledger/) on siscto.si, as of Nov 11, 2026: company announcements checked against public evidence. Desk: [The Gigawatt Ledger](https://siscto.si/ledger/) on siscto.si.

The SI 100

## Not ranked in The SI 100

Vantage Data Centers is not ranked in The SI 100, Q4 2026. A company is ranked when it has data on at least 3 of the seven measures; this file has data on 1. That is a statement about what the desks cover, not about the company.

Compute in the ground

**No record**

weight 20

Compute announced

**2.30 GW**

weight 15

App reach

**No record**

weight 15

Hiring

**No record**

weight 15

Lobbying on SI

**No record**

weight 15

Federal use

**No record**

weight 10

SEC filings

**No record**

weight 10

[The ranking](https://tsio.si/si-100/) · [How it is made](https://tsio.si/si-100/method/)

### The names this file joins

- **Matched as**: the pattern \bVantage\ Data\ Centers\b on the owner, operator, user, vendor, developer and maker fields of the other desks

One company files, hires and builds under many names. The company name table maps them, and it is published in full on the [method page](https://tsio.si/si-100/method/#names). Spotted a wrong match or a missing record? Tell the team on [Telegram](https://t.me/entersio) or [X @entersio](https://x.com/entersio) with the source.
